PROVEN PROJECT PORTFOLIO

Engineering Safer, Faster Corridors Across Indian Railways

Over 200+ stations commissioned, 150+ RKM of Automatic Block Signalling, and turnkey Electronic Interlocking proof consultancy delivered across Indian Railways.

Automatic Block Signalling & Kavach

Automatic block signalling corridors and Kavach / TCAS trackside interface engineering.

Automatic Block Signalling (ABS) Corridor Engineering LANDMARK CORRIDOR
ABS SIGNALLING • 150+ RKM Indian Railways 2023 – Present

Automatic Block Signalling (ABS) Corridor Engineering

Complete turnkey design, circuit diagrams, drawings, and technical assurance delivered for dense mainline automatic block sections. Replaced absolute block working with 4-aspect automatic signalling.

Drawings: Auto Section SIP, ABS Cable Route Plan, ABS Cable Core Plan, ABS Location Particulars, ABS CT Rack & Relay Rack Particulars, ABS Data Logger Circuits, ABS Interface Circuits, UFSBI System Config, NV MUX Circuits.

150+ RKMDouble Line Track
100%CRS Approval
Multi-OEMDesign & Drawing
Request Case Study → Independent Safety Assessment (ISA) Verified
Kavach / TCAS Trackside Interface Engineering
ATP / KAVACH • 80+ DESIGNS Indian Railways 2023 – Present

Kavach / TCAS Trackside Interface Engineering

Stationary Kavach radio unit interfacing, locomotive RFID tag coordinate validation, and signal aspect interface circuits along dense mainline corridors.

Drawings: Floor Plan, Cable Route Plan, RFID Tag-TIN Layouts, Table of Control, RFID Tag Data, Track Profile Table, Interface Circuits & Contact Analysis.

80+Designs
KavachV4.0
Multi-OEMDesign & Drawing

Station Modernization

Signal interlocking plans, dog charts and drawing validation for high-capacity junction stations.

Station Redevelopment & Yard Remodelling
STATION REDEV • 50+ STATIONS Indian Railways 2023 – Present

Station Redevelopment & Yard Remodelling

Comprehensive Signal Interlocking Plan (SIP), dog charts, and turnkey drawing validation for high-capacity junction stations across Indian Railways.

Drawings: S&T Estimation, SIP, TOC / RCC, Cable Route Plan, Cable Core Plan, Track Bonding Plan, Location Particulars, CT Rack & Relay Rack Particulars, LC Gate Circuits, SWRD, Data Logger Circuits, As-Made Circuits, Earthing Diagram.

50+Stations
Multi-OEMDesign & Drawing
IndianRailways

Yard Verification & IV&V

Independent verification of interlocking design, and electronic interlocking upgrades for junction yards.

Independent Verification & Validation (IV&V)
IV&V PROOF • 100+ YARDS Indian Railways 2023 – Present

Independent Verification & Validation (IV&V)

Independent verification and validation of bit charts, station data tables, square sheets, and fail-safe safety protocols across 100+ station yards with zero defects.

Drawings: S&T Estimation, SIP, TOC / RCC, Cable Route Plan, Cable Core Plan, Track Bonding Plan, Location Particulars, CT Rack & Relay Rack Particulars, LC Gate Circuits, SWRD, Data Logger Circuits, As-Made Circuits, Earthing Diagram.

100+Yards
Multi-OEMDesign & Drawing
IndianRailways
Junction Yard Remodelling & Route Expansion
JUNCTION UPGRADE • 4 JUNCTIONS Indian Railways 2023 – Present

Junction Yard Remodelling & Route Expansion

Upgraded aging mechanical levers to state-of-the-art Electronic Interlocking systems with VDU route controls and automated flank protection circuits.

Drawings: S&T Estimation, SIP, TOC / RCC, Cable Route Plan, Cable Core Plan, Track Bonding Plan, Location Particulars, CT Rack & Relay Rack Particulars, LC Gate Circuits, SWRD, Data Logger Circuits, As-Made Circuits, Earthing Diagram.

30+Routes
Multi-OEMDesign & Drawing
IndianRailways
200+ Stations Commissioned
150+ RKM Dense Mainline ABS Signalling
100+ Yards Independently Verified
100% First-Time CRS Approvals

Let's Build a
Better Connected Tomorrow

Partner with AAV Works for smarter, safer and more resilient rail networks.

Get in Touch →
PEOPLE
RAILS
PROGRESS