PROPRIETARY S&T INNOVATIONS

High-Reliability Hardware & Software for Mission-Critical Rail Networks

At AAV Works, we engineer breakthrough hardware modules and intelligent automation platforms that redefine safety, accelerate Table of Control verification, and ensure zero-defect interlocking deployments.

Core Railway Signaling & Interlocking Drawings

Complete drawing packages for conventional yard signaling and electronic interlocking, from estimation to as-made records.

Preview of Signal Interlocking Plan (SIP)PDF

Signal Interlocking Plan (SIP)

Station yard Signal Interlocking Plan for Renigunta Jn. showing the main, loop and goods lines, signal and level-crossing positions, with the track sections table, supervisory track sections table, aspect sequence chart, system of block working and C.R.S. approval block.

View PDF → Large format • 1 sheet • 711 KB
Preview of Table of Control / Route Control Chart (TOC / RCC)PDF

Table of Control / Route Control Chart (TOC / RCC)

Route Control Chart listing, for every signal and route, the destination, points set and locked, track circuits to be clear, other controls, approach locking, back locking by track circuit, and overlap and release conditions.

View PDF → A3 • 1 sheet • 115 KB
Preview of Cable Route & Cable Core PlansPDF

Cable Route & Cable Core Plans

Cable core plan for the Challavaripalle to Tadipatri ABS section: the ABS hut and location boxes LB5 to LB18, core allocation to the signals (AS / AN series) and the level crossing gate lodges (LC 159 and 160).

View PDF → Large format • 1 sheet • 668 KB
Preview of Track Bonding PlansPDF

Track Bonding Plans

Track bonding plan for a station yard between SPE (km 8.13) and DVR (km 7.45): up and down lines, points and crossovers, track circuit numbers, TF / TR bonding positions and the positive / negative return legend.

View PDF → Large format • 1 sheet • 118 KB
Preview of Location Box ParticularsPDF

Location Box Particulars

Location box wiring sheets for signal units (for example the S25 advance starter and S1 home signal boxes), showing the signal relays, terminal rows and 12C cable terminations to the relay room.

View PDF → A3 • 3 sheets • 278 KB
Preview of Station Working Rule Diagrams (SWRD)PDF

Station Working Rule Diagrams (SWRD)

Station working diagram for the JKO-GY automatic block section with electronic interlocking: up and down main and loop lines, track section and supervisory track section tables, aspect sequence chart and statutory sanctions for previous works.

View PDF → Large format • 1 sheet • 357 KB
Preview of Earthing & Surge Protection DiagramsPDF

Earthing & Surge Protection Diagrams

Earthing and bonding layout for the ABS equipment hut: perimeter ring conductor, GI copper plate earth pits, equipotential busbars and Class A protection, with special notes, general notes (Class A, B & D SPDs as per RDSO spec) and abbreviations.

View PDF → A3 • 1 sheet • 217 KB
Preview of S&T EstimationPDF

S&T Estimation

Summary of the project estimate by bill: EI modification and domino panel, supply of cable, supply of material and execution, with the overall total.

View PDF → Letter • 1 sheet • 267 KB
Coming soon4 more documents

Drawings in Auto Section (Automatic Block Signaling - ABS)

Mid-section drawing sets for Automatic Block Signaling: signal spacing, cabling, huts, interface circuits and block communication.

Preview of Auto Section SIPPDF

Auto Section SIP

Auto section Signal Interlocking Plan with the ABS hut controlling gear details for the down and up directions, aspect sequence chart, and track section and supervisory track section tables for both lines.

View PDF → Large format • 1 sheet • 357 KB
Preview of ABS Cable Core PlanPDF

ABS Cable Core Plan

Cable core plan for the Vanganur to Challavaripalle ABS section: the ABS hut (km 357/7-5) with location boxes LB1 to LB12 on the south and north sides, and the cable cores allocated to the automatic signals (AS / AN series).

View PDF → Large format • 1 sheet • 543 KB
Preview of ABS Floor PlanPDF

ABS Floor Plan

Floor plan for the ABS hut with the relay room and IPS room: dimensions, relay racks, C.T. racks, NV MUX, power rack, battery charger, VRLA batteries, MSDAC, UFSBI and CCTV rack positions.

View PDF → A3 • 1 sheet • 94 KB
Preview of ABS CT Rack & Relay Rack ParticularsPDF

ABS CT Rack & Relay Rack Particulars

C.T. Rack-1 particulars with terminal rows A to D and 12C cable terminations to the relay room and SM room, plus the Relay Rack-1 relay arrangement for the ABS hut.

View PDF → A3 • 5 sheets • 683 KB
Preview of ABS Interface CircuitsPDF

ABS Interface Circuits

ABS hut interface circuits: main functions of the ABS equipment hut (SIL-4 / UFSBI-4) with inputs and outputs between hut and relay room, and the ABS equipment hut to EI rack input and output connections.

View PDF → A3 • 3 sheets • 333 KB
Preview of ABS Data Logger CircuitsPDF

ABS Data Logger Circuits

Data logger wiring for the ABS hut: door lock, relay contact and ACPR inputs, and UFSBI system A / system B status points such as CPU fail, link fail and power off.

View PDF → A3 • 1 sheet • 123 KB
Preview of Network / Voice Multiplexer (NV Mux) CircuitsPDF

Network / Voice Multiplexer (NV Mux) Circuits

Relay rack to NV MUX wiring: main and redundant NV-MUX input cards and output cards, with WAGO numbering and MSDAC connections.

View PDF → A3 • 3 sheets • 349 KB
Coming soon2 more documents

Specialized Drawings in Kavach (Indigenous ATP System)

Specialized drawing and data packages for the indigenous Automatic Train Protection system, from relay rooms to RFID tag engineering.

Preview of RFID Tag-TIN LayoutsPDF

RFID Tag-TIN Layouts

Kavach RFID tag layouts for the station yard and the block section: normal, signal foot, communication entry / exit, adjacent line, adjustment / junction, dead-stop and turnout / TIN discrimination tags, with OHE mast numbers, chainage, supervisory track sections and total tag count, updated per the latest TAN guidelines and LiDAR survey.

View PDF → Large format • 2 sheets • 524 KB
Preview of Kavach Table of Control (TOC)PDF

Kavach Table of Control (TOC)

Kavach Table of Control for the station: entry and exit signals, line, signal aspects, points and track circuits required in route, TINs required, RFID check sequence, entry-to-exit tag distance, movement authority and authorised speed.

View PDF → A3 • 3 sheets • 311 KB
Preview of RFID Tag Data EngineeringPDF

RFID Tag Data Engineering

Kavach tag data sheets (Rev 2.0.0): 64-bit X / Y fields for normal tags and adjacent line tags covering tag type, Kavach version (Spec 3.2 / 4.0), RFID tag ID, absolute location, TIN, station IDs, section type, tag duplication, CRC and page X / page Y.

View PDF → A3 • 6 sheets • 550 KB
Preview of Track Profile TablesPDF

Track Profile Tables

Stationary Kavach track profile table: entry and exit signals, line, turnout speed, permanent speed restrictions, gradients, level crossing gate details and track conditions with start distance and length.

View PDF → A3 • 1 sheet • 301 KB
Preview of Interface Circuits & Contact AnalysisPDF

Interface Circuits & Contact Analysis

S-Kavach interface diagram connecting relay contacts to the Kavach terminals (B1 to B6, N1 to N6), together with the contact analysis sheets for the interlocking relays.

View PDF → A3 • 2 sheets • 228 KB
Coming soon2 more documents

Let's Build a
Better Connected Tomorrow

Partner with AAV Works for smarter, safer and more resilient rail networks.

Get in Touch →
PEOPLE
RAILS
PROGRESS